
Site4 min
Frames leave the workshop numbered and ready to install, while the foundations are still being poured.
Our frames are cold-formed, punched and cut on a numerically controlled machine with 0.5 mm accuracy. Every panel is assembled in the workshop, screwed with M6 fasteners, numbered and listed on the assembly drawings: what arrives on site matches the 3D model exactly.
The site no longer stops waiting for the structure. While the foundations are poured, production has already started. On site, a small team installs panels weighing less than 100 kg by hand, with screwdrivers as the only tooling, and the building is watertight far sooner.








