How long does it take to build a prefabricated house?

Speed is the major asset of industrialised construction. For a light gauge steel frame house, efficiency is gained at three stages.

Design: Based on the architect's plans, our design office models and calculates the structure. The digital model directly controls production, without re-entering data.

Manufacturing: In our factory, sheltered from bad weather, the profiles are produced by cold forming, numerically controlled cutting and punching, then assembled into numbered panels. Production takes place while the foundations are laid on the building site: these two stages progress in parallel.

Assembly: The panels arrive ready to assemble, in the correct installation order. The builder's team erects the frame of a detached house in a few days, whereas a traditional build requires several weeks for the structural work.

Overall, the total duration of a construction project can be significantly reduced, with fewer weather hazards and a reliable schedule.

Stabiframe does not install: we deliver the light gauge steel frame to professionals carrying out the project. Architects, home builders, property developers: contact us to plan your next development.